Insights

Archaeology, planning and the development programme

Written for the people who actually carry archaeological risk: land and development directors, planning and environmental consultants, and contractors programming enabling works.

Guidance

Start here

Start with the Cambridge planning system, then move into the fieldwork, cost and programme decision your project has reached.

Cambridgeshire planning

Cambridgeshire HER and archaeological design briefs

How the county evidence base, site brief and contractor WSI fit together.

Read →

Major development

Development archaeology in North East Cambridge

Brownfield constraints, evidence and programme decisions for the major growth area.

Read →

Procurement

Procuring archaeological services in Cambridgeshire

How to issue a comparable fieldwork tender and expose programme and cost assumptions.

Read →

Planning

Discharging archaeological planning conditions in Cambridgeshire

The sequence from condition wording to sign-off, and where programmes usually slip.

Read →

Planning

What a Written Scheme of Investigation actually is

Why the WSI is the document that controls cost, method and approval timing.

Read →

Evaluation

What happens if trial trenching finds archaeology

The decisions that follow a positive evaluation, and how to keep options open.

Read →

Cost

How to reduce archaeological mitigation costs

Where the real savings are — and the false economies that cost more later.

Read →

Programme

Archaeology and the construction programme

How much time archaeology genuinely takes, stage by stage.

Read →

Land

Assessing archaeological risk before land acquisition

What to check before committing to a Cambridgeshire greenfield site.

Read →

Mitigation

Archaeological watching brief: what it is and when it is enough

The lightest mitigation option, and the sites where it becomes a trap.

Read →

Mitigation

Strip, map and sample explained

The mitigation method that often costs less than full excavation.

Read →

Planning

What a desk-based assessment covers

The cheapest archaeological document, and the limits of what it can conclude.

Read →

Evaluation

Geophysical survey in Cambridgeshire

Where magnetometry works, where fen and made ground defeat it.

Read →

Cost

Post-excavation and archive: the cost developers forget

Why the bill and the programme continue after the plant leaves site.

Read →

Cost

Who pays for archaeology on a development site?

How cost is allocated between landowner, promoter and contractor.

Read →

Reference

Need the terminology first?

Use the plain-English glossary to translate the language in a condition, brief, tender or archaeological report.

Open the development archaeology glossary →

Project review

Have a specific question about your site?

General guidance only goes so far. Send us the site and the planning position and we will answer against your actual circumstances.