A reliable budget starts with the required work and its completion obligations. Identify the evidence and scope decisions needed before commissioning a price; site area and landscape alone cannot establish one.

Inputs
Area, landscape, disturbance, stage
Output
Scope questions and budget stages
Basis
Site evidence, not assumed rates
For accuracy
Send the site details to us

Your site

Your starting information

Describe the site so the review can focus on the information still needed. No method or price is determined by these selections.

Scope to resolve

Next decision

Establish the planning requirement and assemble the site evidence before commissioning a method. Assessment, geophysics, trenching and mitigation are separate possible stages, not an automatic sequence for every site.

Information to confirm

  • Disturbance area supplied: 2 ha. Confirm this against the impact plan, not just the red-line boundary.
  • Check HER records, previous investigations, geology and disturbance history against the actual footprint.
  • Provide proposed levels, foundation and drainage depths, access and spoil arrangements.
  • Separate assessment/evaluation, any mitigation, specialist analysis and archive obligations in the budget.

No cost, duration or approved method is inferred from these inputs. A site-specific scope and price are needed.

Check the exact decision notice: method approval, area release and final condition discharge can be different gates.

Budget basis

What an archaeological cost estimate must include

A useful allowance covers the whole planning obligation, not only the days when archaeologists and plant are visible on site.

Evidence and approval
HER data, assessment, authority brief, Written Scheme of Investigation and the review time needed before work can start.
Site delivery
Field team, supervision, plant, welfare, survey control, access, fencing, haul routes, spoil handling and contractor interfaces.
Findings risk
Feature density, depth, preservation, human remains, waterlogged deposits and the agreed route for additional work.
Completion
Interim sign-off, assessment, specialist analysis, final report, archive deposition and any publication needed for discharge.

Archaeological survey costs

Questions developers ask before a scope exists

Separate a commissioned price from an early allowance. Confirm what each figure includes and what still depends on findings.

How much does an archaeological survey for planning permission cost?

There is no reliable single price because 'survey' can mean a desk-based assessment, geophysical survey, trial trenching or a combination. Site area matters, but geology, access, trench coverage, ground conditions, findings and reporting requirements often matter more. Use this worksheet to identify missing information, then request a scoped allowance from the planning position and site evidence.

Is archaeology priced per hectare?

Area is one input, not a rate card. Two sites of the same size can need very different methods and resources. Feature density, deposit depth, contamination, service constraints, plant access, sampling and post-excavation obligations all change the cost.

Does an archaeological quote include reporting and the archive?

It should state this explicitly. Evaluation and mitigation appointments can include fieldwork, interim reporting, final reporting, specialist analysis, finds work, archive preparation and deposition, but allowances vary. Compare inclusions and completion criteria rather than headline fieldwork totals.

Can I get a fixed archaeological cost before trial trenching?

You can obtain a defined price for the assessment or evaluation stage. Where mitigation is not yet defined, ask what evidence and assumptions support the offer, how variations are instructed, and what obligations are excluded. Keep provisional allowances distinct from agreed stage prices.

Project review

Build the budget from a defined scope, not an assumed hectare rate.

Send the planning position, site plan and any survey data. We will come back with the requirement, the method and the programme, with assumptions stated.