Logistics and industrial development
Archaeology for Logistics and Industrial Development in Cambridgeshire
Large-format sheds strip very large areas to formation level, which makes total disturbed area the dominant archaeological cost variable.
- Cost driver
- Total stripped area
- Typical method
- Strip, map and sample in phases
- Integration
- Possible with enabling works if pre-agreed
- Watch for
- Deep drainage and attenuation
Why this scheme type carries the requirement it does
A logistics platform typically involves site-wide stripping, deep drainage, attenuation basins, extensive yard construction and heavy services. Very little of the site remains undisturbed, so sampling arguments have limited traction.
The approach that keeps it proportionate
Because disturbance is extensive and shallow to moderate, strip, map and sample is often the proportionate method, run in phases ahead of the groundworks contractor. This can be integrated with enabling works if it is written into the approved scheme.
Connect archaeology to the earthworks model
Supply formation levels, cut-and-fill plans, yards, drainage and foundation details alongside the enabling programme. Areas described as open space can still be affected by levels, services or construction access; include them in the impact review.
Continue
Before appointing
Turn the requirement into a defined programme decision
Confirm the planning trigger, the area and depth of disturbance, any existing archaeological evidence, and the date that matters to the wider programme. That is the minimum information needed to decide whether the next step is appraisal, evaluation, mitigation or a regulator discussion.
Sources and further reading
We use current public policy and guidance to keep this practical explanation grounded. Sources checked 19 September 2026.
- National Planning Policy Framework ↗
Ministry of Housing, Communities and Local Government
- Historic environment: planning practice guidance ↗
Ministry of Housing, Communities and Local Government
- Standards and guidance ↗
Chartered Institute for Archaeologists
Questions
Common questions on this
Can archaeology run behind our earthworks contractor?
It can run in sequence with them, phase by phase, but the sequence must be agreed in the approved scheme. Retro-fitting archaeology into a live earthworks programme is where standing-time claims come from.