Logistics and industrial development

Archaeology for Logistics and Industrial Development in Cambridgeshire

Large-format sheds strip very large areas to formation level, which makes total disturbed area the dominant archaeological cost variable.

Cost driver
Total stripped area
Typical method
Strip, map and sample in phases
Integration
Possible with enabling works if pre-agreed
Watch for
Deep drainage and attenuation

Why this scheme type carries the requirement it does

A logistics platform typically involves site-wide stripping, deep drainage, attenuation basins, extensive yard construction and heavy services. Very little of the site remains undisturbed, so sampling arguments have limited traction.

The approach that keeps it proportionate

Because disturbance is extensive and shallow to moderate, strip, map and sample is often the proportionate method, run in phases ahead of the groundworks contractor. This can be integrated with enabling works if it is written into the approved scheme.

Connect archaeology to the earthworks model

Supply formation levels, cut-and-fill plans, yards, drainage and foundation details alongside the enabling programme. Areas described as open space can still be affected by levels, services or construction access; include them in the impact review.

Before appointing

Turn the requirement into a defined programme decision

Confirm the planning trigger, the area and depth of disturbance, any existing archaeological evidence, and the date that matters to the wider programme. That is the minimum information needed to decide whether the next step is appraisal, evaluation, mitigation or a regulator discussion.

Sources and further reading

We use current public policy and guidance to keep this practical explanation grounded. Sources checked 19 September 2026.

Questions

Common questions on this

Can archaeology run behind our earthworks contractor?

It can run in sequence with them, phase by phase, but the sequence must be agreed in the approved scheme. Retro-fitting archaeology into a live earthworks programme is where standing-time claims come from.

Project review

Archaeology on a logistics and industrial development scheme?

Send the impact plan, depth schedule, planning requirement and the milestone driving your decision. Include the sector-specific information listed above so the review can address your actual scheme.