Solar farm development

Archaeology for Solar Farm Development in Cambridgeshire

Solar schemes cover very large areas with comparatively shallow disturbance, which makes them one of the few development types where archaeological scope can genuinely be argued down.

Main opportunity
Arguing preservation in place across the array
Real disturbance
Cables, tracks, inverters, substation
Evidence needed
Element-by-element disturbance model
Typical method
Targeted work on intrusive elements

Why this scheme type carries the requirement it does

Pile-driven mounting, cable trenching, access tracks, inverter stations and substation compounds disturb ground very unevenly. Much of a solar site may see almost no disturbance at all, while cable runs and compound bases are locally intrusive.

The approach that keeps it proportionate

Model disturbance element by element rather than treating the whole lease area as impacted. A well-evidenced disturbance model is the basis for arguing that mitigation should follow the cable routes and compounds, with preservation in place across the array itself.

Questions

Common questions on this

Will we have to excavate the whole field?

Very often not. Where the design genuinely limits disturbance to cable routes, tracks and compounds, a proportionate scheme concentrates on those, provided the disturbance model is evidenced rather than asserted.

Project review

Archaeology on a solar farm development scheme?

Send the footprint, the depth of disturbance and the planning position. We will set out the requirement and the programme it implies.