Prepared and maintained by Cambridge Development Archaeologyfor development teams working across Cambridge and Cambridgeshire.
Sources, review dates and corrections →Why this area needs its own approach
The emerging North East Cambridge allocation covers a large, intensively used urban area rather than an open greenfield site. Existing infrastructure can both truncate archaeology and bury it beneath made ground. That makes previous disturbance evidence, impact depth and safe access central to archaeological design.
The archaeological questions for a brownfield masterplan
A desk-based assessment should distinguish documented truncation from assumed disturbance. Evaluation then needs to test the areas where deposits may survive, while coordinating with demolition, contamination and utility investigations rather than treating each programme separately.
- Map basements, tanks, foundations and service corridors against the proposed impact
- Use borehole and ground-investigation evidence to understand made-ground depth
- Plan intrusive archaeology around contamination controls and safe access
- Phase investigation so results can still influence layout, levels and foundations
Programme and procurement
The best opportunity to control cost is before enabling works are fixed. A coordinated investigation can share access, welfare, survey control and ground information. A late archaeological package has fewer design options and is more likely to sit directly on the critical path.
For a live parcel, send the planning position, demolition and ground-investigation information, impact plan and target dates. Those documents matter more than the red-line area alone.
Current public policy source
The Greater Cambridge draft Local Plan identifies North East Cambridge as a strategic urban allocation. The policy remains emerging and should be checked at the date of any application.